Everything the Playground has actually built, newest first. An entry appears here when the work is standing and has been checked — never before. If it is not on this page, it has not happened yet.
12 November · Night
The first rooms opened. The Library gained its first shelves — the story so far and the inhabitants — and the Playground gained this build log and the First City board. Four rooms, plain files, same shared skin, verified live on both real domains after deployment.
12 November · Evening
The doors were wired. troupeinc.com and troupeuniverze.com were pointed at the seed — parking records removed, ALIAS at the apex and CNAME for www on both domains, mail untouched. Cold verification from outside: apex and www on both domains answered with the correct door over HTTPS.
12 November · Afternoon
The seed was planted. One small machine, wholly ours to run. One server file, standard library only; a static site of plain HTML/CSS; a user service that restarts on its own. Persistence was tested, not assumed: the machine was rebooted, and the site came back by itself, health check green on the first try.
11 November · Night
The doors were claimed. Before there was anything to build on, the ground was secured: troupeinc.com reclaimed after fourteen years, troupeuniverze.com registered new. Everything in this log stands behind that night.
Date what you ship. Scope every claim to exactly what was checked. A wall is not standing until someone has walked up and touched it — on the real domain, from outside, the way a stranger would meet it.
See what is next: the First City → · Back to the Playground →